For the last 11 weeks we've been working at YPC on upgrades to the site, specifically for this game. With 6 weeks to go we are nearly there. Come and have a look at what we've done!!

At game on we'll have used
30 Tonns of wood
2.5km of planking

We'll have added
Two new game zones
9 Bridges
100,000 nails
600m of netting

We'll have changed
Two safe area's into one mega safe Zone

The following vid shows a few pictures of the site, none of the new zones, they are being kept under wraps until April.
The vid is "Bridge" heavy, but there is a good reason for that.

It's the biggest purpose built paintball bridge in Europe.
At normal walking speed, it takes just over 1 minute to cross
It took 4 years to build
It's probably the most expensive paintball structure in the UK.

Have a look and see what you think.

http://www.youtube.com/watch?v=BhaUFxdskkE